CallGet a quote
Oakk SolutionsSheet A-00Byron Bay, NSW

Built to the drawing Architectural builders in Byron Bay and the Northern Rivers

Oakk builds architect-designed homes, extensions and bespoke carpentry across the Byron hinterland. One builder on your job from set-out to handover, working to the documentation rather than around it.

Standard
Fixed quotes, variations in writing, a written update every week
Based
Byron Bay, working across the Northern Rivers
Scope
New builds, extensions, carpentry, property care

Sheet A / Build

What we build

Three kinds of work make up most of what we do. All of it starts from documentation and a set-out.

Sheet A / Detail

The part you never see

Once the linings go on, nobody looks at the frame again. It is still the thing holding your house up in a hinterland southerly forty years from now.

Deep eaves because it rains sideways here. A ventilated subfloor because the ground stays damp. Structure sized for the site rather than copied off the last job. None of it shows up in a photo, which is exactly why it is worth asking a builder about.

Cross section through a typical Oakk buildA section drawing showing concrete footings below ground, a subfloor and bearer system, stud walls at two point seven metres, a collar tie, and rafters with deep eaves suited to the subtropical climate.SPAN VARIES2700RIDGEEAVE 900STUDBEARER + JOISTFOOTINGFFLNGL
Section through a typical build. Deep eaves, ventilated subfloor, structure sized for the site rather than the catalogue.

Sheet A / Method

How a job runs

The same six stages every time, so you always know what is happening and what comes next.

  1. Stage 01

    Drawings and quote

    You send the architectural set. We price it against the specification and come back with a fixed quote, a programme and a written list of what we have assumed. If something in the documentation will cause trouble on site, you hear about it now rather than at frame stage.

  2. Stage 02

    Set-out

    Levels, boundaries and the building footprint go in on the ground. This is the stage that decides whether every line in the finished house is true, and it is the one most worth slowing down for.

  3. Stage 03

    Structure

    Footings, slab or subfloor, frame and roof. You get photos and a written update each week, including the things that moved and the things that did not.

  4. Stage 04

    Lock-up and services

    Cladding, windows, roofing, then the trades through. Any variation is priced and approved by you in writing before the work happens, not added to an invoice afterwards.

  5. Stage 05

    Finishes

    Linings, joinery, exposed timber and the detail work that people actually touch. This is where a job is judged, so it gets the time it needs.

  6. Stage 06

    Handover and defects

    We walk the house with you, write the defects list together, and fix it. Then you get the manuals, warranties and certificates in one place.

Sheet B / Property

Smaller work, same crew

Not every job is a new house. These are the jobs that keep Northern Rivers property standing up, and we still run them properly.

Sheet C / Coverage

Where we work

Based in Byron Bay, on site across the Northern Rivers.

Sheet C / Clients

What clients say

Oakk was the only builder who actually understood Byron council regs. They finished our deck in 3 days and did an amazing job.

Sam D. / Mullumbimby

After the floods, they rebuilt my granny flat better than before. Honest, fast, and super local.

Claire T. / Lismore

Sheet C / Answers

Questions we get asked

Do I need council approval for a deck, studio or granny flat?

Often not. NSW exempt development rules let you build many decks, studios and granny flats without a DA, provided the job stays inside set limits for size, height and boundary setbacks. Whether your block qualifies depends on its zoning, overlays and what is already built on it. We check your address against the exempt and complying development codes before you spend anything on drawings.

What does it cost to build an architect-designed home here?

There is no honest single figure, and any builder who gives you one over the phone is guessing. Cost in the Northern Rivers is driven by site access, slope, the structural system, the level of finish and whether the block sits in a bushfire or flood overlay. We price from the architectural set and the specification, then give you a fixed quote with the assumptions written down so you can compare it properly against another builder's.

Are you licensed and insured?

Ask us for our current licence and insurance certificates before you sign anything, and we will send them. Do the same with every builder you talk to. In NSW you can check any contractor licence yourself on the Fair Trading website, and for residential work over $20,000 the builder must also hold Home Building Compensation cover. A builder who hesitates on that request is telling you something.

Do you build on flood-affected land?

Yes. Since the 2022 floods most of our Lismore and Coraki work has been resilient rebuilds. That means lifting switchboards and services above the flood planning level, using water-shedding linings like marine ply and fibre cement instead of plasterboard, and detailing the ground floor so it drains and dries rather than holding water in the wall cavity.

How long does a new build take?

A new architect-designed home in this region typically runs 10 to 18 months on site, and the range is wide because wet season, hinterland access and long lead times on imported finishes all move it. We give you a programme with the quote and update it monthly, including the things that have slipped and why.

What areas do you work in?

Byron Bay, Bangalow, Mullumbimby, Brunswick Heads, Lennox Head, Ballina, Lismore, Kingscliff, Pottsville and Tweed Heads. If you are just outside that and the job is the right fit, call and ask.

Will I be dealing with the builder or a project manager?

The builder. Oakk is small on purpose, so the person who answers the phone is the one running your job. On a build this size you should be able to raise a detail question and get an answer from whoever will actually set it out, rather than from someone relaying it.

Send us the drawings

If you have an architectural set, or a block and a rough idea, start there. We will tell you honestly whether we are the right builder for it.

Email
hello@oakk.co
Hours
7:00am to 5:00pm, Monday to Friday
Based
Byron Bay, NSW